BACKYARD CONTAINER
PERMIT DOCUMENTS TYPICALLY REQUIRED*:
* FEES BELOW ARE IN ADDITION TO THE CONTAINER UNIT AND ON-SITE SITE CONSTRUCTION* BUILDING PLAT REQUIRED BY YOUR LOCAL JURISDICTION
MODEL B $5,500
MODEL C $7,500
SOIL BEARING ANALYSIS – CASE-BY-CASE BASIS N.I.C.
** PRICING SUBJECT TO CHANGE. WILL CONFIRM THE FINAL PRICE DURING THE SITE ASSESSMENT PHASE.
ARCHITECTURE / ENGINEERED PERMIT PLANS
MODEL A – $3,500
MODEL B – $4,000
MODEL C – $5,000
CIVIL BOUNDARY / TOPO / TREE / UTILITY PLAN – $2,800
BUILDING PLAT REQUIRED BY DC – $1,050
CIVIL WALL CHECK REQUIRED IF UNIT WILL BE PLACED ON PROPERTY LINE – $1,850
CIVIL SEDIMENT CONTROL PLAN REQUIRED IF MORE THAN 50SF DISTURBED – $1,900
CIVIL LOT CONVERSION IF YOUR LOT IS STILL RECORDED IN THE 800’S – $1,950
PERMIT SUBMISSION – BY OWNER ($0) OR BY US – $2,750
PERMIT FEES TO CITY / JURISDICTION – BY OWNERESTIMATED – $500
SOIL BEARING ANALYSIS – CASE-BY-CASE BASIS – N.I.C.
CIVIL STAKE OUT REQUIRED PRIOR TO CONSTRUCTION START – $1,200
** PRICING SUBJECT TO CHANGE. WILL CONFIRM THE FINAL PRICE DURING THE SITE ASSESSMENT PHASE.